Total Pageviews

Search This Blog

Thursday, March 17, 2011

Oracle Apps AIM Documents

Oracle AIM Documents
Business Process Architecture (BP)
BP.010 - Define Business and Process Strategy
BP.020 - Catalog and Analyze Potential Changes
BP.030 - Determine Data Gathering Requirements
BP.040 - Develop Current Process Model
BP.050 - Review Leading Practices
BP.060 – Develop High-Level Process Vision
BP.070 – Develop High-Level Process Design
BP.080 – Develop Future Process Model
BP.090 – Document Business Procedure
Business Requirements Definition (RD)
RD.010 – Identify Current Financial and Operating Structure
RD.020 – Conduct Current Business Baseline
RD.030 – Establish Process and Mapping Summary
RD.040 – Gather Business Volumes and Metrics
RD.050 – Gather Business Requirements
RD.060 – Determine Audit and Control Requirements
RD.070 – Identify Business Availability Requirements
RD.080 – Identify Reporting and Information Access Requirements
Business Requirements Mapping
BR.010 – Analyze High-Level Gaps
BR.020 – Prepare mapping environment
BR.030 – Map Business requirements
BR.040 – Map Business Data
BR.050 – Conduct Integration Fit Analysis
BR.060 – Create Information Model
BR.070 – Create Reporting Fit Analysis
BR.080 – Test Business Solutions
BR.090 – Confirm Integrated Business Solutions
BR.100 – Define Applications Setup
BR.110 – Define security Profiles
Application and Technical Architecture (TA)
TA.010 – Define Architecture Requirements and Strategy
TA.020 – Identify Current Technical Architecture
TA.030 – Develop Preliminary Conceptual Architecture
TA.040 – Define Application Architecture
TA.050 – Define System Availability Strategy
TA.060 – Define Reporting and Information Access Strategy
TA.070 – Revise Conceptual Architecture
TA.080 – Define Application Security Architecture
TA.090 – Define Application and Database Server Architecture
TA.100 – Define and Propose Architecture Subsystems
TA.110 – Define System Capacity Plan
TA.120 – Define Platform and Network Architecture
TA.130 – Define Application Deployment Plan
TA.140 – Assess Performance Risks
TA.150 – Define System Management Procedures
Module Design and Build (MD)
MD.010 – Define Application Extension Strategy
MD.020 – Define and estimate application extensions
MD.030 – Define design standards
MD.040 – Define Build Standards
MD.050 – Create Application extensions functional design
MD.060 – Design Database extensions
MD.070 – Create Application extensions technical design
MD.080 – Review functional and Technical designs
MD.090 – Prepare Development environment
MD.100 – Create Database extensions
MD.110 – Create Application extension modules
MD.120 – Create Installation routines
Data Conversion (CV)
CV.010 – Define data conversion requirements and strategy
CV.020 – Define Conversion standards
CV.030 – Prepare conversion environment
CV.040 – Perform conversion data mapping
CV.050 – Define manual conversion procedures
CV.060 – Design conversion programs
CV.070 – Prepare conversion test plans
CV.080 – Develop conversion programs
CV.090 – Perform conversion unit tests
CV.100 – Perform conversion business objects
CV.110 – Perform conversion validation tests
CV.120 – Install conversion programs
CV.130 – Convert and verify data
Documentation (DO)
DO.010 – Define documentation requirements and strategy
DO.020 – Define Documentation standards and procedures
DO.030 – Prepare glossary
DO.040 – Prepare documentation environment
DO.050 – Produce documentation prototypes and templates
DO.060 – Publish user reference manual
DO.070 – Publish user guide
DO.080 – Publish technical reference manual
DO.090 – Publish system management guide
Business System Testing (TE)
TE.010 – Define testing requirements and strategy
TE.020 – Develop unit test script
TE.030 – Develop link test script
TE.040 – Develop system test script
TE.050 – Develop systems integration test script
TE.060 – Prepare testing environments
TE.070 – Perform unit test
TE.080 – Perform link test
TE.090 – perform installation test
TE.100 – Prepare key users for testing
TE.110 – Perform system test
TE.120 – Perform systems integration test
TE.130 – Perform Acceptance test
Performance Testing(PT)
PT.010 – Define Performance Testing Strategy
PT.020 – Identify Performance Test Scenarios
PT.030 – Identify Performance Test Transaction
PT.040 – Create Performance Test Scripts
PT.050 – Design Performance Test Transaction Programs
PT.060 – Design Performance Test Data
PT.070 – Design Test Database Load Programs
PT.080 – Create Performance Test Transaction Programs
PT.090 – Create Test Database Load Programs
PT.100 – Construct Performance Test Database
PT.110 – Prepare Performance Test Environment
PT.120 – Execute Performance Test
Adoption and Learning (AP)
AP.010 – Define Executive Project Strategy
AP.020 – Conduct Initial Project Team Orientation
AP.030 – Develop Project Team Learning Plan
AP.040 – Prepare Project Team Learning Environment
AP.050 – Conduct Project Team Learning Events
AP.060 – Develop Business Unit Managers’ Readiness Plan
AP.070 – Develop Project Readiness Roadmap
AP.080 – Develop and Execute Communication Campaign
AP.090 – Develop Managers’ Readiness Plan
AP.100 – Identify Business Process Impact on Organization
AP.110 – Align Human Performance Support Systems
AP.120 – Align Information Technology Groups
AP.130 – Conduct User Learning Needs Analysis
AP.140 – Develop User Learning Plan
AP.150 – Develop User
AP.160 – Prepare User Learning Environment
AP.170 – Conduct User Learning Events
AP.180 – Conduct Effectiveness Assessment
Production Migration (PM)
PM.010 – Define Transition Strategy
PM.020 – Design Production Support Infrastructure
PM.030 – Develop Transition and Contingency Plan
PM.040 – Prepare Production Environment
PM.050 – Set Up Applications
PM.060 – Implement Production Support Infrastructure
PM.070 – Verify Production Readiness
PM.080 – Begin Production
PM.090 – Measure System Performance
PM.100 – Maintain System
PM.110 – Refine Production System
PM.120 – Decommission Former Systems
PM.130 – Propose Future Business Direction
PM.140 – Propose Future Technical Direction

“Team Work” More We Less Me.|| Sameer Patil

No comments:

Post a Comment